Single-use supplies
Surgery and endoscopy
Sutures, drains, trocars and endoscopy accessories for operating theatres and endoscopy units.

What is included
- Sutures, absorbable and non-absorbable
- Wound drains
- Chest drainage
- Laparoscopic trocars
- Endoscopy accessories
Variants, sizes and sterility
- Sutures by material, size (USP or metric), needle type and length
- Drains: silicone or PVC, flat or round, with or without suction bulb
- Chest drainage units and catheters in several sizes
- Trocars in several diameters, bladed or bladeless; endoscopy accessories to your list, for example biopsy forceps and snares
Standards and classification
- EN ISO 10993-1
- Biological evaluation of medical devices.
- EN ISO 11607-1
- Packaging for terminally sterilised medical devices.
- EN ISO 20417
- Information to be supplied by the manufacturer.
The class depends on the product: sutures, drains, trocars and endoscopy accessories fall into different classes under Regulation (EU) 2017/745. The maker's declaration of conformity states the class and the notified-body certificate number where one is required.
Packaging, labelling and documents
- Sterile and non-sterile products carry the symbols of EN ISO 15223-1 on the label.
- Each offer states the packaging unit (pieces per inner pack, per box and per carton) and the pallet data, so you can check order and storage units.
- Labels and instructions for use come in the language required in the country of delivery; we confirm this with the maker before the offer.
- Each delivery carries the lot numbers on the packaging and on the delivery documents.
How to request a quote
Send us:
- The specification, or the product you use now (type, size, sterile or non-sterile)
- The quantity per order and per year, if you know it
- The delivery place (hospital, ward or central store) and the country
- The tender reference and deadline, if the request is for a tender
- The language of labels and instructions you need
Lead time. Lead time depends on the product, the maker's stock and the destination. We state it in the written offer, after confirming it with the maker, and we give no delivery date before that.
Request a quote
Tell us the specification and the quantity and we reply in writing.